• Study and design of stocking silos for empty HDPE bottles addressed to a German multinational chemical company

To face promptly the order from a major German multinational chemical company concerning a new batch of stocking silos for empty HDPE plastic bottles, Bierre Automazioni was involved by the awarded oem integrator for the complete mechanical and electrical design according to the high-quality standards required by the final end-use client.

Based upon the available footprint area and the customer’s needs, Bierre Technical Department has ensured deep expertise and maximum efficiency in all the steps of the engineering project, such as:

  • preliminary analysis of the silo design and plant layout;
  • mechanical and electrical study;
  • sizing of single components;
  • realization of all executive details;
  • software automation program;
  • assistance during manufacture, assembly and pre-testing in the workshop.